Construction progress as of 24 October 2017

Block 25 and block 27 have both reached top floor. The showflat has been completely torn down and also the structure in front of block 31. Some cabinets seen inside of the units but not yet installed.




Zoom into the photos to see cabinets in lower level units of block 29






Showflat torn down


Popular Posts