Construction Progress as of 25 September 2018
More than a month has passed since I last visited and much have changed. I took more photos this time. In the past, before digital camera, I would take my time to take a photo. Now, I take many shots and hope that some of these turn out to be acceptable. Below are some of these photos (and the rest remain in a NAS).
With this, let the countdown begin...
![]() |
A bridge so that residents do not have to walk around the pool to get from Block 27 to Block 21 |
With this, let the countdown begin...
10